|
PEARL OIL
Fabrication |
|
Thaioil - Technip
Civil work |
|
GM
Fabrication, Erection |
|
BCP2
Civil work |
|
OVAL
Fabrication, Erection |
|
Yong Kee
Civil work |
|
Condensate
Design, Fabrication, Erection |
|
|
Condensate Recovery Project
Piping work |
|
Refrigeration Improvement
Civil work, Steel structure work, Equipment Installation |
|
Piping work for Heat Recovery from GT Flue Gas
Piping work |
|
Well Tie-in Services for Yetagun4
Engineering, Procurement & Construction in mechanical and instrument work for YETAGUN Offshore Gas Well TIE-INS |
|
AN & MMA Structural steel Project
Structural steel fabrication and erection work. |
|
AN&MMA Piping Project
Piping fabrication and erection work |
|
MRU Fuel Gas Piping Foundation & Installation Project
Installation Foundation & Piping For Reactor |
|
|
BCP Piping Project (PQ)
Piping fabrication and erection work |
|
EBSM Plant Project
Debottleneck Heat Exchanger 01E004 |
|
A/G Piping fabrication and installation work for CUP3 Phase 1
Piping & Piping Support Fabrication and Installation |
|
Modify New Chiller Route Line K2U
Piping and Support Installation |
|
Maintenance Services
Supply Manpower Yearly Contract |
|
Manpower Supply for Piping Construction work for Night Shift
Supply Manpower |
|
Unit Plant 3 (0310A) Piping Installation Work
Piping & Piping Support Installation |
|
PTTPE Ethane Cracker (AG Piping Work P2-Area) Project
The fabrication and erection for piping work |
|
Industrial Ring Road Project
The fabrication and assembly work of 2 nos. of 8,000 tons of steel structure |
|
Methyl Ester/Fatty Alcohol Plant Project
The fabrication of steel structure and mechanicalwork and erection |
|
BCP-Offsite Piping Area Project
Design, Procurement, Fabrication and erection for pipe work and steel work including maintenacne & Shutdown work |
|
Maintenance Contract (IRPC) Project
Repair Tank |
|
BCP Piping Project (LPG Tank)
Design, Procurement, Installation and Inspection of LPG system |
|
The Provision Mechanical, Electrical & Instrument Works and Maintenance Services
Supply Manpower |
|
Main Pipe Rack MOC Cracker Project
Construction of pre-cast concrete work for main pipe rack distance 1,000 m. |
|
Manhole & Ductbanks work for MEA Chidlom Terminal Station
Power cable Ductbanks & Manholes |
|
ISBL A/G Piping Fabrication & Installation Work Project
Piping and Pipe Support (Fabrication and Installation Work) |
|
IRPC Maintenance
shutdown, plant maintenance |
|
Alcan-G3 (Fabrication & Assembly) - 2006 Project
The fabrication of pipe spools in total 400,000 DB, consist of steel structure for export modules to Australia, installation of 12,000 tons Modules, for export to Australia. |
|
Alcan - G3 (Piping Fabrication) - 2005 Project
The fabrication of Pipe in total 400,000 DB. and 1,000 tons of the steel structure for export modules to Australia. |
|
TPAC & TPCC Project
Maintenance, renew & installation, basic design of installation piping system, structure steel and equipment installation. |
|
Cargo International Building for Thailand Second International Airport Project
The fabrication and erection work of 8,000 tons of steel structure for the biggest cargo building in Thailand |
|
Fawley Sulphur Free Mogas Piperack Modules Project
The fabrication and erection work of pipe and steel steel structure in total 2,000 tons for exported pipe rack modules to U.K. |
|
Blasting Group Factory Project
The fabrication and erection work of steel structure factory including the |
|
Vinyl Thai Inthanon I Project
Piping & Pipe Support the fabrication and Installation |
|
Maintenance Contract (Hess) Project
High pressure pipe work consist of carbon steel, stainless steel, low temp, carbon steel and duplex, Include tank and mechanical work for gas plat. |
|
BLCP Power Plant Project
The fabrication work of steel structure for 700 MW. boiler Structure building |